MOQ, sampling and lead time depend on a defined production route.

Our minimum order is 50 units across all products. Production for a 50-unit order takes 3–7 days after drawings and order details are confirmed and payment is received, excluding transport. Larger quantities and sampling require a separately confirmed schedule.

OEM and ODM process from project brief through production
50 unitsMinimum order · all products
3–7 daysProduction · 50-unit orders
20,000 units/dayFinished display production capacity

Production for a 50-unit order takes 3–7 days after drawings and order details are confirmed and payment has been received. Transport time is excluded. Larger-order schedules and sample timing are confirmed separately.

Company-confirmed information · October 6, 2026. Daily capacity is not a delivery guarantee for an individual order. Final specifications and schedule are confirmed in the written quotation.
2018Verified establishment year
51–100Verified team size
3,000–5,000㎡Verified factory size
Zhejiang, ChinaManufacturing location

What is the minimum order for a custom display?

The minimum order quantity is 50 units across all products, as confirmed by Zhuochao on October 6, 2026. Material, structure, branding and packing still need to be defined for a complete quotation.

  • Production method and setup
  • Material and thickness
  • Custom tooling or fixtures
  • Logo printing and color requirements
  • Assembly and packaging configuration

What should a buyer expect from the sampling stage?

The sample should validate structure, product fit, stability, finish, branding and packaging assumptions before volume production. A sample request must state which features are production-intent and which may use temporary methods.

What affects sample and production lead time?

Timing begins only when inputs are complete. Design revisions, missing artwork, product samples, tooling, material availability, branding approvals, packaging tests, quantity and inspection requirements can each change the schedule.

How can buyers prevent avoidable delays?

Submit complete product dimensions and artwork, nominate one approval owner, consolidate feedback, approve measurable requirements in writing and confirm packaging before production. Late specification changes should trigger a documented schedule review.

What belongs in a request for quotation?

Include product or display drawings, actual product dimensions, quantity tiers, material preference if known, logo files, packaging, destination country, delivery term and required date. Ask the quotation to separate tooling, sample, unit, packaging and transport-related charges.

SOURCE & REVIEW

How this buyer content is maintained

Published and reviewed by Yiwu Zhuochao Plastic Products Co., Ltd. Company facts are checked against the assessed Alibaba supplier profile; product and process guidance is based on the supplier’s current manufacturing scope and project-review workflow. Commercial terms and performance statements are published only where the owner can support them. Third-party certification issued by Intertek (天祥集团) is documented on the certification page; unit prices are quoted per project and are not published.

Last reviewed: Assessed supplier profile ↗Verified company facts →Factory evidence guide →
BUYER FAQ

Frequently asked questions

What is your MOQ for acrylic display stands?

The minimum order quantity is 50 units across all products. Confirm the design, dimensions, material, branding and packaging in the quotation.

Can I order a sample before mass production?

Sampling can be discussed after the project scope is reviewed. The sample purpose, production-intent features, charges and approval criteria should be confirmed in writing.

How long does production take?

Production for a 50-unit order takes 3–7 days after drawings and order details are confirmed and payment has been received. Transport time is excluded. Larger-order schedules and sample timing are confirmed separately.

What causes the most common project delays?

Incomplete dimensions, changing specifications, late artwork, slow sample approval, unconfirmed packaging and late quantity changes are common causes.